

Quote
2025-Q-01-022
Issued
Issued
15 January, 2025
15 January, 2025
From
From
Crystal Precision
09942469020
9581 Provincial Road, Purok Maganda, Barangay Gulang Gulang, Lucena City, 4301 Quezon, Philippines
Crystal Precision
09942469020
9581 Provincial Road, Purok Maganda, Barangay Gulang Gulang, Lucena City, 4301 Quezon, Philippines
To
To
Abegail Villanueva
Cavinti, Laguna
Abegail Villanueva
Cavinti, Laguna
About the project
About the project
Project Description: Abegail Villanueva Cabinetry Project
This project details the design, fabrication, and installation of custom aluminum cabinets for Abegail Villanueva's residence in Cavinti, Laguna. Our focus is on creating highly functional, durable, and aesthetically pleasing cabinetry specifically engineered to withstand the local climate.
Project Description: Abegail Villanueva Cabinetry Project
This project details the design, fabrication, and installation of custom aluminum cabinets for Abegail Villanueva's residence in Cavinti, Laguna. Our focus is on creating highly functional, durable, and aesthetically pleasing cabinetry specifically engineered to withstand the local climate.
Deliverables
Deliverables
Modular Aluminum Kitchen Cabinet
Aluminum Framing:
1x2 inch tubular aluminum
1x1 inch tubular aluminum
Exterior Finish:
White color finish Aluminum Composite Panels (ACP)
Shelves & Drawers for Storage
PVC Doors
Countertop and backsplash:
Quartz
Unit Price`
₱ 123,000
Qty.
1 package
₱ 123,000
Kitchen Quartz Countertop
Unit Price`
₱ 35,000
Qty.
1 package
₱ 35,000
Total
₱ 158,000
Project Summary
Project Summary
Total Contract Price: ₱ 158,000
I. Materials & Key Features
Stated above
II. Project Timeline (Estimated 3-5 Weeks)
Procurement (Weeks 1–2): Material sourcing and final site validation.
Fabrication (Weeks 3–4): Off-site precision cutting and assembly.
Installation (1-2 Days): On-site mounting, quartz fitting.
III. Payment Schedule
50% Initial Commitment (₱ 75,000.00) (Paid January 10, 2026): Due upon signing to secure materials and production slot.
50% Final Turnover (₱ 83,000.00): Due upon 100% completion, plumbing/electrical testing, and final walkthrough.
IV. Warranty & Terms
Service Warranty: 6-Month Workmanship Warranty covering structural adjustments and installation quality from the date of turnover.
Validity: This proposal remains valid for 15 days.
Total Contract Price: ₱ 158,000
I. Materials & Key Features
Stated above
II. Project Timeline (Estimated 3-5 Weeks)
Procurement (Weeks 1–2): Material sourcing and final site validation.
Fabrication (Weeks 3–4): Off-site precision cutting and assembly.
Installation (1-2 Days): On-site mounting, quartz fitting.
III. Payment Schedule
50% Initial Commitment (₱ 75,000.00) (Paid January 10, 2026): Due upon signing to secure materials and production slot.
50% Final Turnover (₱ 83,000.00): Due upon 100% completion, plumbing/electrical testing, and final walkthrough.
IV. Warranty & Terms
Service Warranty: 6-Month Workmanship Warranty covering structural adjustments and installation quality from the date of turnover.
Validity: This proposal remains valid for 15 days.